My last post was about the ‘review’ of the Hinkley C project. I have now received the final decision from the BEIS over my Freedom Of Information request.
I have not spent much time looking through the document by a link from a link does take you to some of the related documents. These can be found at here.
Firstly I thought that I must have missed these when I originally looked for the review documents. However, the documents are dated the 29th September 2016 and were put on the web on the same date, which is several days after my original request which was on the 21st September 2016.
Leave a Reply